Austin Industrial helped a key industrial customer convert an existing wet sluice bottom ash system to a closed-loop, dry bottom ash system. The $45M project featured 341,000 work hours, 43,000 feet of above-ground pipe, 13,000 cubic yards of concrete, and 543,000 linear feet of cable. The Austin team completed this significant effort with 0.00 TRIR and 100% of welds accepted.