Austin Commercial is currently constructing the two-phased North Concourse Program (NCP) at the Salt Lake City International Airport, totaling 887,486 square feet. The first phase of the North Concourse, totaling 465,775 square feet, is a new 20-gate multi-level concourse, scheduled to be completed in 2020. The new flexible gate layout is planned to serve a mix of aircraft sizes. The second phase includes the underground central tunnel, an additional ten gates on the central portion of the NCP, hydrant fueling system, utilities and apron paving, anticipated to be operational in 2023.