Hereford Municipal Airport


Austin Bridge & Road completed the concrete paving of a new runway at Hereford Municipal Airport. The runway lengthened the airport’s overall runway space from 5,378 feet to 6,100 feet. The runway also widened the existing space from 75 feet to 100 feet.

The project required laying 90,100 square yards of 8” thick pavement with both reinforcing steel and dowel baskets.